ENGINEERING DECISION INTELLIGENCE

Turn BOM risk into defensible engineering decisions.

Cadivor connects component risk, supplier evidence, AI-assisted review, alternate qualification, and decision history in one release workflow.

✓ No credit card✓ CSV and Excel BOMs✓ Evidence-linked recommendations
Xmotor_controller_rev_c.xlsx1,842 components · 36 suppliers
Motor Controller Rev CEngineering Review
BOM receivedLive review
RELEASE REVIEW

Motor Controller Rev C

motor_controller_rev_c.xlsx
BOM received
ReceivedValidatingAnalyzingRisksCopilotEvidenceRecSupplierDecisionApprovedMonitor
UploadValidateAnalyzeDecideMonitor
motor_controller_rev_c.xlsxAwaiting upload · 36 suppliersWaiting
SPREADSHEET PREVIEW
Part NumberManufacturerQtySupplier
MPU6050InvenSense820DigiKey
LM35DNTexas Instruments1,240Mouser
TPS54331Texas Instruments560Newark
1,842 rows mapped4 required columns matched
Parsing rowsMatching lifecycleChecking suppliersRetrieving decisionsMonitoring active
BOM HealthRelease readiness
Release blockersProduction impact
Lifecycle alertsMatched notices
AlternatesQualified sources
Priority risksRanked by impact
1MPU6050EOL · single approved sourceBLOCKER
2LM35DN18-week lead time · single sourceQUALIFY
3TPS54331Lifecycle change detectedMONITOR
Supplier intelligenceLM35DN · authorized sources
SupplierMPNStockLeadRegionLifecycleConc.Status
DigiKeyAuthorizedLM35DN42,8608 wkUSActiveLowRecommended
MouserAuthorizedLM35DN31,24010 wkGlobalActiveMedQualified
NewarkAuthorizedLM35DN9,81012 wkEUNRNDHighAvailable
✦ Ask CadivorEvidence grounded
Ask a production-readiness question…
Reading 1,842 BOM rowsMatching lifecycle noticesComparing authorized supplyValidating qualified alternatesReviewing prior engineering decisions
14 evidence points · lifecycle · supplier · decision history
EOL notice · MPU6050DigiKey · 42,860 unitsICM-42688-P qualifiedDR-1031 precedent
DR-1048 pending
ENGINEERING DECISION RECORDDR-1048 · Motor Controller Rev C
Owner Jordan EllisConfidence 93%Evidence 14 sources

Qualify LM35DN second source and replace MPU6050 before production release.

Evidence verifiedEngineering reviewedAwaiting approvalMonitoring queued
Monitored componentsLifecycle · supply · alert rules
MPU6050EOL lifecycle watchSupply stableActive
LM35DNSecond-source qualificationLead time trackedActive
TPS54331Lifecycle noticeAlert rule matchedActive

Continuous monitoring confirmed across authorized suppliers.

Lifecycle evidence WaitingSupply evidence WaitingDecision evidence Pending✓ Decision approved · monitoring active
AUTHORIZED SUPPLIER COVERAGEDigiKeyMouserNewarkOctopart Planned
RELEASE READINESS0Evidence-linked BOM Health
DECISION TRACEABILITYDR-1048Owner, rationale, approval history
AUTHORIZED SUPPLY0Inventory and concentration reviewed
CONTINUOUS MONITORINGActiveLifecycle and supply changes watched
ONE RELEASE WORKFLOW

A BOM moves. Evidence follows. Decisions become traceable.

The same motor_controller_rev_c.xlsx review advances from upload through continuous monitoring.

motor_controller_rev_c.xlsx1,842 components
  1. 01Upload BOM
    ImportValidated

    1,842 components imported from Excel

    motor_controller_rev_c.xlsx · 36 suppliers normalized
  2. 02Analyze Risk
    AnalysisScored

    BOM Health 72 · 4 release blockers

    MPU6050 EOL · LM35DN lead time · lifecycle notices matched
  3. 03Ask Cadivor
    Evidence reviewReviewing

    Evidence review begins across lifecycle, supply, and alternates

    14 evidence points assembling · 93% confidence target
  4. 04Engineering Decision
    Decision recordApproved

    Mitigation approved · DR-1048 created

    Owner Jordan Ellis · evidence hash verified
  5. 05Continuous Monitoring
    MonitorActive

    Lifecycle and supply monitoring active

    Watching MPU6050 · LM35DN · TPS54331 across authorized sources
01Analysis resolves the release posture
ENGINEERING INTELLIGENCE

One command center for release readiness.

Risk severity, owners, evidence, alternates, and release posture stay connected.

Live mitigation simulationBaseline risk posture00:00
BOM Health72Release readiness
Release blockers4Production impact
Lifecycle alerts17Matched notices
Approved decisions16Audit history
72Blocked
MPU6050EOL blockerBlocker
LM35DNSource concentrationOpen
TPS54331Lifecycle noticeReview
RELEASE POSTURE

Release blocked by component risks

Cadivor is tracing lifecycle and supplier evidence before recommending action.

Explore the product →
02The engineer asks. Evidence answers.
ASK CADIVOR

Watch evidence become an engineering recommendation.

Cadivor assembles BOM, lifecycle, supplier, alternate, and prior-decision evidence before recommending action.

✓ BOM structure loaded✓ Lifecycle notices checked✓ Supplier exposure compared✓ Alternates validated
ASK CADIVOR · LIVE REVIEWmotor_controller_rev_c.xlsx
Ready for engineer question
JEJordan EllisHardware Engineering
Reading 1,842 BOM rowsWaiting
Matching lifecycle noticesWaiting
Comparing authorized supplyWaiting
Validating qualified alternatesWaiting
Reviewing prior decisionsWaiting
BOMLifecycleSupplyAlternatesDecisions
SUPPLIER EVIDENCE
DigiKey · Authorized42,860 units · 8 wk
MPU6050 alternateICM-42688-P qualified
✦ CadivorReviewing evidence…
Analyzing motor_controller_rev_c.xlsx for release blockers and supplier exposure.
Blocking components will appear here

Recommended mitigation will appear after evidence review completes.

03A recommendation becomes a sourcing plan
SUPPLIER INTELLIGENCE

Move from distributor tabs to a qualified sourcing decision.

Compare authorization, inventory, lead time, geography, and concentration in one workspace.

LM35DN
LIVE RECOMMENDATION

DigiKey is the preferred qualification source.

Authorization AuthorizedRegion GlobalQualification QualifiedStatus Recommended
SupplierAuthMPNInventoryLeadRegionLifecycleConc.Alt qualScoreStatus
QUALIFICATION SUMMARY
Inventory 42,860Lead time 8 weeksLifecycle ActiveConcentration Reduced 38%

Highest authorized inventory with the shortest verified lead time.

04The sourcing plan becomes an auditable decision
DECISION INTELLIGENCE

The output is not another alert. It is a defensible engineering record.

CADIVOR VERIFIED
ENGINEERING DECISION RECORD

DR-1048 · Motor Controller Rev C

StatusREADY FOR APPROVAL
Owner
Confidence0%
Evidence0 sources
Affected BOMmotor_controller_rev_c.xlsx
Primary partMPU6050 · LM35DN
IssueEOL blocker · single source
ApproverJordan Ellis
MonitoringPending
Approval historyEvidence verified · Reviewed
Rationale hashEV-84A2
Release impactProduction blocked
DECISION

Qualify the LM35DN second source and replace the MPU6050 before production release.

The action removes a confirmed EOL blocker, reduces single-source exposure, and preserves electrical compatibility.

Evidence assembledEngineering reviewedDecision approvedMonitoring active
ENGINEERING APPROVALAwaiting signature
Continuous monitoringPending
BUILT FOR HARDWARE TEAMS

From component data to accountable action.

Engineering

Prioritize release blockers and compatibility risk.

Supply Chain

Compare authorized inventory and source concentration.

Quality

Preserve evidence, ownership, and approval history.

Leadership

See portfolio health and release posture at a glance.

FAQ

Questions hardware teams ask before starting.

What BOM formats does Cadivor accept?

CSV and Excel BOMs are supported, with normalization for common part-number, manufacturer, description, and quantity columns.

Does Cadivor replace engineering judgment?

No. Cadivor organizes evidence, identifies risks, and recommends actions while preserving human ownership and approval.

Can decisions be audited later?

Yes. Decision records preserve the evidence reviewed, rationale, owner, confidence, and approval history.

Can Cadivor monitor approved BOMs?

Yes. Monitoring tracks lifecycle, supply, and risk changes after a decision is approved.

START WITH A REAL BOM

Bring your next release decision into Cadivor.

Upload a BOM, surface release blockers, and create an evidence-linked decision record.

Start free trial →Book a demo
PRODUCT

Engineering intelligence from BOM upload to monitored decision.

Cadivor unifies analysis, evidence, AI-assisted review, alternatives, decisions, and continuous monitoring in one release workflow.

Start free trialExplore capabilities
BOM ANALYZER

Normalize spreadsheet data and rank release risk.

Import CSV or Excel BOMs, validate columns, match lifecycle notices, and score production impact before release review begins.

1,842 rows validatedBOM Health 724 release blockers
motor_controller_rev_c.xlsxImport validated
PartManufacturerQtyRisk
MPU6050InvenSense820Blocker
LM35DNTI1,240Qualify
TPS54331TI560Monitor
ENGINEERING INTELLIGENCE

One command center for release readiness.

Risk severity, owners, evidence, alternates, and release posture stay connected as mitigation progresses.

Health 72 → 96Blockers 4 → 0
Release postureBaseline risk posture
BOM Health72
Blockers4
Alerts17
Decisions16
ASK CADIVOR

Evidence-grounded answers for production readiness.

Engineers ask release questions and Cadivor assembles BOM, lifecycle, supplier, alternate, and prior-decision evidence before recommending action.

93% confidence14 evidence points
Live reviewReady
Is this BOM ready for production release?
Analyzing release blockers and supplier exposure…
SUPPLIER INTELLIGENCE

Compare authorized inventory and concentration.

Review stock, lead time, region, lifecycle status, and qualification posture across authorized distributors.

LM35DN sourcingAuthorized sources
SupplierStockLeadStatus
DigiKey42,8608 wkRecommended
Mouser31,24010 wkQualified
Newark9,81012 wkAvailable

DigiKey is the preferred qualification source.

ALTERNATE QUALIFICATION

Validate compatibility before changing the BOM.

Compare electrical compatibility, availability, and mitigation value for alternate components before release approval.

MPU6050 mitigationQualified alternate
CurrentMPU6050

EOL · single source

AlternateICM-42688-P

Qualified · compatible

ENGINEERING DECISION RECORDS

Capture rationale, owner, evidence, and approval.

Every recommendation becomes a defensible engineering record with traceable evidence and approval history.

DR-1048Ready for approval
ENGINEERING DECISION

Qualify LM35DN second source and replace MPU6050.

Owner Jordan Ellis · 93% confidence · 14 evidence sources · Monitoring queued after approval.

CONTINUOUS MONITORING

Watch approved BOMs after release.

Track lifecycle notices, supply changes, and alert rules across authorized sources after a decision is approved.

Monitoring active3 components watched
MPU6050Lifecycle watchLM35DNLead time trackedTPS54331Alert rule matched
REPORTS & EXPORTS

Export engineering artifacts, not marketing summaries.

Generate BOM health, lifecycle exposure, decision records, and supplier risk summaries for review and audit.

Report libraryEngineering outputs
BOM HEALTH92 / 100
LIFECYCLE9 active notices
DECISIONDR-1048 approved

See the complete engineering workflow on your own BOM.

Start free trial →
SOLUTIONS

One decision system for every team touching the BOM.

Cadivor connects engineering, supply chain, quality, and leadership around the same evidence — not separate spreadsheets and distributor tabs.

HARDWARE ENGINEERING

Release with fewer hidden component risks.

Prioritize design blockers, validate alternates, and review recommendations grounded in the active BOM.

  • Production-readiness review
  • Lifecycle exposure analysis
  • Alternate qualification
Release reviewBOM Health 72
Blockers0
Lifecycle alerts0
Alternates0
PostureBlocked
SUPPLY CHAIN & PROCUREMENT

Act before lead time and concentration become emergencies.

Compare authorized inventory, supplier coverage, geography, and sourcing exposure in one workspace.

  • Authorized-source intelligence
  • Lead-time comparison
  • Recommended source selection
LM35DN qualificationDigiKey recommended
DigiKey · 42,860 · 8 wkRecommended
Mouser · 31,240 · 10 wkQualified
Newark · 9,810 · 12 wkAvailable
QUALITY & COMPLIANCE

Make every decision traceable.

Preserve evidence, rationale, ownership, and approval history in structured engineering records.

  • Evidence-linked records
  • Approval history
  • Audit-ready exports
DR-1048Audit trail complete
DECISION RECORD

Evidence verified · Engineering reviewed · Approval recorded

14 sources · Owner Jordan Ellis · Rationale hash EV-84A2 · Compliance context preserved.

ENGINEERING LEADERSHIP

See release posture across the portfolio.

Understand BOM health, blockers, decisions, and monitoring status without chasing spreadsheets.

  • Portfolio health
  • Open blockers
  • Approved decisions
Portfolio viewRelease posture
Monitored BOMs0
Open blockers0
Approved decisions0
Release ready0
Built forIndustrialMedical DevicesAutomotiveAerospaceRoboticsConsumer Hardware
PRICING

Start with one BOM. Scale to an engineering decision system.

Clear plans for students, individual engineers, teams, and enterprise programs.

Starter

$0/month

Explore the workflow with limited monthly analysis.

Get started
  • 5 BOM analyses/month
  • 10 components/BOM
  • Basic risk summary
  • CSV export
Professional

$99/month

For engineers managing active hardware programs.

Start trial
  • Unlimited BOM analyses
  • 2,500 monitored parts
  • Ask Cadivor
  • Decision records
Enterprise

Custom

For larger organizations and governed deployments.

Book a demo
  • SSO and advanced security
  • Custom integrations
  • Priority support
  • Enterprise controls

Compare plans

CapabilityStarterProfessionalBusinessEnterprise
BOM analysisLimitedUnlimitedUnlimitedUnlimited
Ask Cadivor
Monitoring2,500 partsUnlimitedUnlimited
Team collaboration
API and integrationsCustom
RESOURCES

Practical engineering intelligence for hardware teams.

Guides, reports, and templates designed around real BOM and release decisions.

REPORT

Lifecycle Exposure Report

Understand where obsolescence and manufacturer changes threaten releases.

REPORT

Supplier Risk Summary

Authorized inventory, lead time, concentration, and qualification posture by part.

GUIDE

Cadivor Implementation Guide

Deploy Cadivor across engineering, sourcing, and quality workflows.

REAL CADIVOR OUTPUTS

Reports built for engineering review, not marketing summaries.

Every report connects the risk, evidence, owner, recommendation, and approval state.

LIFECYCLE EXPOSURE9 active notices
BOM HEALTH92 / 100
DECISION RECORDDR-1048 · ApprovedEvidence verified · Monitoring active
COMPANY

Building decision infrastructure for hardware engineering.

Cadivor exists to help teams move from scattered component data to clear, defensible action.

OUR MISSION

Make every hardware decision evidence-linked, accountable, and monitorable.

Engineering teams still make critical component decisions across spreadsheets, distributor tabs, email threads, and disconnected reports. Cadivor brings the evidence and decision into one operating system.

Evidence over guesswork

Recommendations should show the facts behind them.

  • BOM, lifecycle, and supplier evidence linked
  • 14+ sources per decision example
Engineering judgment stays central

AI supports decisions; people own them.

  • Human owner on every record
  • Approval before release action
Decisions deserve history

Rationale and approvals should survive the meeting.

  • Rationale hash and audit trail
  • Approver and timestamp preserved
Monitoring closes the loop

Approved decisions must remain safe as conditions change.

  • Lifecycle and supply alerts
  • Post-approval watch rules
BUILT AROUND THE DECISION

Cadivor does not stop at identifying risk.

It carries evidence into a recommendation, captures human judgment, and monitors the approved action over time.

ENGINEERING DECISION RECORDQualify ICM-42688-P as alternateOwner · Maya ChenConfidence · 93%Evidence · 14 verified pointsAPPROVED
0Connected release workflow
0Evidence points per decision example
24/7Monitoring-ready architecture
0Human-owned approvals
BOOK A DEMO

Request a conversation

Share your workflow context — we respond within one business day.

This form opens your email client with the completed request.